|
|
Component Parts Sales Terms & Conditions
All orders received for component parts will be honored at our factory in accordance with the following terms and conditions.
- Credit -
All orders require a 30% deposit for first time customers or C.O.D. for established customers unless credit arrangements have been made prior to placing of orders.
- F.O.B. -
All prices quoted are F.O.B our plant.
- Telephone Orders -
Steel Building Supply, Inc. assumes no responsibility for the accuracy of the orders placed over the telephone.
- Manufacturing -
All orders for materials are normally ready for pickup in (5) five to (7) seven working days, depending on the type of materials ordered. Any discrepancies in orders must be reported within one week after pickup. All orders not picked up after (30) thirty days will be sold.
- Cancellations or Changes -
Cancellations or changes will not be accepted after an order has been placed and manufacturing has begun. Any refunds given on returnable items will be charged a 10% restocking fee. (Any manufactured items are not returnable)
- Price Changes -
Prices are subject to change without notice.
- Special Orders -
Items which we do not stock, and must be special order are subject to a 50% deposit before it will be ordred and will be charged freight.
- Storage -
Galvalume, galvanized and painted sheet metal have a good service life when exposed to normal weather conditions. However, these same sheets are subject to stain when water sits upon or becomes trapped between the sheets. If sheets are to be stored for any period of time, they should be bundled and stood on end against an interior wall. Metal should be spread or fanned out at the bottom ends to allow for air circulation and should be off the ground on blocks. Never cover the material with plastic as this promotes sweating. Failure to follow these steps may result in water stains and premature white rusting which the manufacturer cannot be held responsible for.
- Cutting -
When using a power saw to cut metal panels several precautions should be taken. Place bottom (interior) surface of the sheet up and cover with a tarp to protect the top (exterior) surface from the hot metal filings and reduce the chance of damage. When doing the actual cutting, be sure to wear protective eyeglasses, and do it away from other unused or applied panels. Metal filings may become embedded in the surface of the sheet and if left alone will rust quickly. Be sure to wipe all filings from both surfaces before application, and remove filings made by screws immediately after application.
- Delivery -
Steel Building Supply, Inc. offers delivery right to your home or job sight. Delivery charges are based on mileage, so call for prices.
|
|
 |